In most sectors a booth is compared on its highest number: peak airflow, peak temperature, largest size. In aerospace, marine and rail that comparison stops working.

The industry page puts it directly — equipment is judged on its ability to repeat the same result and evidence it, not on a peak figure. So repeatable coating documentation starts in the configuration itself, not in a log filled in after each cycle.

Repetition is a configuration property

A cycle that repeats is a cycle whose inputs were fixed: the heat curve, the extraction direction, the filtration class and the supply voltage. Leave any one of them open and repetition becomes a matter of luck.

That is why every configuration item is signed off before manufacture rather than after installation.

Configuration items that repetition is built on
ItemWhat is publishedWhy it belongs in the record
Heating systemDiesel · gas · electric · heat pump · short-wave infraredThe heat curve follows the system chosen
Heat output200,000 – 600,000 kcal/hThe thermal ceiling of the cycle
FiltrationEU3, EU4, EU5 — up to three-stage bag and high-efficiency filtration at 98%Spray environment cleanliness cycle to cycle
Voltage380 V three-phase · 50 or 60 HzStable supply is a condition of a stable cycle

What is not claimed here

Approval and documentation requirements differ by authority and by activity, and they are established with the relevant body on the customer side. What is supplied from our side is a configuration whose items are documented and signed off before manufacture.

Frequently asked questions

Is the chamber handed over with a record of the approved configuration?

The configuration is signed off before manufacture with its items stated: internal size, extraction direction, heating system, filtration stages and doors. That sign-off is the reference the cycle is built on.

Does imported equipment meet a local standard?

SASO conformity for imported equipment sits within the regulatory considerations published for this sector.

What gets fixed first in a project of this type?

Internal size, taken from the part dimensions plus the technician working space around it. The site survey precedes both.

Read also

Next step

Send the documentation requirements that apply to your facility and your process stages, and we will come back with a configuration whose items are signed off before manufacture. Talk to a specialist. More detail on the aerospace, marine and rail industry page.

A technical question about a specific machine?

Send us the dimensions and the operating conditions, and we will answer with the configuration that fits them.