In most sectors a booth is compared on its highest number: peak airflow, peak temperature, largest size. In aerospace, marine and rail that comparison stops working.
The industry page puts it directly — equipment is judged on its ability to repeat the same result and evidence it, not on a peak figure. So repeatable coating documentation starts in the configuration itself, not in a log filled in after each cycle.
Repetition is a configuration property
A cycle that repeats is a cycle whose inputs were fixed: the heat curve, the extraction direction, the filtration class and the supply voltage. Leave any one of them open and repetition becomes a matter of luck.
That is why every configuration item is signed off before manufacture rather than after installation.
| Item | What is published | Why it belongs in the record |
|---|---|---|
| Heating system | Diesel · gas · electric · heat pump · short-wave infrared | The heat curve follows the system chosen |
| Heat output | 200,000 – 600,000 kcal/h | The thermal ceiling of the cycle |
| Filtration | EU3, EU4, EU5 — up to three-stage bag and high-efficiency filtration at 98% | Spray environment cleanliness cycle to cycle |
| Voltage | 380 V three-phase · 50 or 60 Hz | Stable supply is a condition of a stable cycle |
What is not claimed here
Approval and documentation requirements differ by authority and by activity, and they are established with the relevant body on the customer side. What is supplied from our side is a configuration whose items are documented and signed off before manufacture.
Frequently asked questions
Is the chamber handed over with a record of the approved configuration?
The configuration is signed off before manufacture with its items stated: internal size, extraction direction, heating system, filtration stages and doors. That sign-off is the reference the cycle is built on.
Does imported equipment meet a local standard?
SASO conformity for imported equipment sits within the regulatory considerations published for this sector.
What gets fixed first in a project of this type?
Internal size, taken from the part dimensions plus the technician working space around it. The site survey precedes both.
Read also
Next step
Send the documentation requirements that apply to your facility and your process stages, and we will come back with a configuration whose items are signed off before manufacture. Talk to a specialist. More detail on the aerospace, marine and rail industry page.